Contractors trained before they arrive.
Sites must prove that contractors were trained before they get a permit to work. At most sites, that check is still a paper list at the gate. Contractors take the site training through a hosted link. At the gate, one scan shows who is cleared.
Built for site HSE managers
Site pass
Crew B · Scaffolding
Not cleared
Crew B · contractor 4
Missing
Hot work induction
Checked live · Gate 2 · 07:42
Trusted by leaders at
From the invite to the gate, without a paper list.
Site induction · Working at height · 3 trainings · 14 languages
Trained before they arrive
Third parties carry the highest risk and get the shortest safety training. Hosted links give every third-party crew the site training before their first shift.
Lecția 2 din 4 · 3 min
Unde este punctul de adunare?
Lângă poarta 2
În parcare
La depozit
The same approved trainings
Safety rules often don’t reach a frontline that speaks many languages. Contractors take the same trainings as your own team, built from your approved SOPs, in 200+ languages.
Cleared
Contractor 2
All 3 trainings done
Gate 2 · checked live
Not cleared
Contractor 4
Missing: hot work induction
Gate 2 · checked live
One scan at the gate
At most sites, the check is still a paper list at the gate. Shows who is cleared, and which trainings are still missing. Status is checked live at every scan.
Secure, approved and live in 12 weeks.

Enterprise security
- ISO 27001 certified
- Microsoft or Google sign-in
- You own your content and can export it at any time
Your experts approve
- AI drafts, people approve
- Every answer from the approved version
- Version history and audit trail
We integrate with your workflows
- Keep the systems you run today
- LMS via SCORM / xAPI, or we host it
- Works next to your EHS and document systems
Live fast
- First site in 12 weeks
- Under 20 hours of your team’s time
- Our team builds it, your experts approve
What site HSE teams ask about contractor training
How do contractors get the training?
Through a hosted link, before their first shift.
What happens at the gate?
One scan shows who is cleared and which trainings are still missing. Status is checked live at every scan.
Is it the same training as our own staff?
Yes. Contractors take the same trainings as your own team, built from your approved SOPs.
Which languages?
200+ languages, including Arabic and Hebrew.
How long until it’s live at the gate?
The first site goes live in 12 weeks with under 20 hours of your team’s time. Forward-deployed engineers do the building.
Start with one site,
or one use case.
Live in under 12 weeks, with under 20 hours of your team’s time.
